Research

01

Mechanics with Random Parameters and Stochastic Finite Element Methods

We investigate the fundamental principles of mechanics with random parameters and their applications in numerical methods. Our work develops perturbation–Galerkin and homotopy stochastic finite element methods for efficiently and accurately solving random eigenvalue problems, analyzing nonlinear static and dynamic responses, and assessing reliability.

02

Physical Identification of Structural Parameters

We use uncertain measurement data from static and dynamic tests and health monitoring systems to identify physically meaningful material properties, stiffness, boundary conditions, and damage parameters at a specified modeling scale. The aim is to bring finite element models closer to real structures, providing a basis for subsequent damage identification, digital twin development, and accurate safety and reliability analysis.

03

Structural Health Monitoring

We develop core algorithms for structural health monitoring using new stochastic finite element methods and physical identification of parameters in individual structural regions, enabling efficient and accurate damage identification in large engineering structures. These algorithms connect condition sensing, data acquisition, model updating, damage identification, and condition assessment to form effective health monitoring systems for the safe operation and maintenance of bridges, supertall buildings, long-span spatial structures, and other major infrastructure.

04

Seismic and Wind Engineering and Structural Reliability

We investigate response analysis, stability, vibration mitigation and seismic isolation, and safety and reliability assessment for engineering structures subjected to earthquakes and wind loads, including structures with uncertain parameters.

Grant-Funded Projects

10 projects
  1. Nonlinear statistical model updating and safety and reliability assessment of long-span prestressed concrete beam structures in mid-service life

    Funding / Client
    National Natural Science Foundation of China
    Duration
    2020.01–2023.12

    Principal investigator

  2. Reliability analysis of the fatigue life of in-service long-span prestressed concrete beam structures using multivariate statistical data

    Funding / Client
    National Natural Science Foundation of China
    Duration
    2016.01–2019.12

    Principal investigator

  3. Reliability analysis for the safety assessment of existing concrete beam structures through statistical model updating

    Funding / Client
    National Natural Science Foundation of China
    Duration
    2014.01–2017.12

    Principal investigator

  4. Damage identification in long-span beam structures using changes in static load position

    Funding / Client
    National Natural Science Foundation of China
    Duration
    2011.01–2013.12

    Principal investigator

  5. Damage identification in large spatial grid structures using statistical models

    Funding / Client
    National Natural Science Foundation of China
    Duration
    2003.01–2005.12

    Principal investigator

  6. Early warning methods and system implementation for performance deterioration in long-span steel roof structures exposed to strong winds and tropical corrosive environments

    Funding / Client
    Hainan Provincial Natural Science Foundation Innovative Research Team Program (522CXTD517)
    Duration
    2022.04–2024.12

    Key contributor

  7. Dynamic model updating and safety assessment of semi-submersible offshore platforms in deep and remote waters

    Funding / Client
    Hainan Provincial International Science and Technology Cooperation R&D Program (GHYF2026044)
    Duration
    2026.05–present

    Principal investigator

  8. Statistical model updating and structural safety of heritage buildings using dynamic test data

    Funding / Client
    Ministry of Education Research Start-up Fund for Returned Overseas Scholars
    Duration
    2006

    Principal investigator

  9. Inspection, diagnosis and assessment of the structural safety of buildings

    Funding / Client
    Wuhan Construction Science and Technology Program (2004-32)
    Duration
    2004–2005

    Principal investigator

  10. Construction acceptance methods for steel beam–column frames and their connections in Wuhan

    Funding / Client
    Wuhan Construction Commission
    Duration
    2007–2008

    Principal investigator

Industry-Funded Projects

39 projects
  1. Traffic safety risk assessment of the Shenzhen–Zhongshan Link during operation

    Funding / Client
    Commissioned by industry
    Duration
    2024–present

    Principal investigator

  2. Vehicle safety analysis for the Changle–Pingtan Cross-Sea Bridge during operation under strong winds

    Funding / Client
    Industry-sponsored project
    Duration
    2012.04.01–2012.12.01
  3. Techniques for the safe and rapid demolition of aging concrete bridges with structural damage

    Funding / Client
    Industry-sponsored project
    Duration
    2025.08.01–2026.10.01
  4. Demolition construction techniques for the Second Lushui Bridge in Chibi

    Funding / Client
    Industry-sponsored project
    Duration
    2013.10.15–2013.10.30
  5. Review and analysis of the structural health monitoring system of the Hanjiang Highway Bridge

    Funding / Client
    Commissioned by industry
    Duration
    2023–present

    Principal investigator

  6. Reconstruction of the Yanzhen–Huangtupo section of National Highway G106 in Yangxin County

    Funding / Client
    Industry-sponsored project
    Duration
    2018.09.01–2019.09.01
  7. Post-construction load testing of the Moshuihu North Road Viaduct

    Funding / Client
    Industry-sponsored project
    Duration
    2014.08.01–2014.09.01
  8. Bridge inspection for the upgrading and widening of the Class I highway on Provincial Highway 316 in Futu Town, Yangxin County

    Funding / Client
    Industry-sponsored project
    Duration
    2014.06.12–2014.06.22
  9. Bridge inspection for the upgrading and widening of the Class I highway on National Highway 314 in Bao’an Town, Daye

    Funding / Client
    Industry-sponsored project
    Duration
    2014.01.01–2014.02.01
  10. Static and dynamic load testing of the trestle bridges at waterways Nos. 1–3 on the Donghu Link

    Funding / Client
    Industry-sponsored project
    Duration
    2014.01.01–2014.12.01
  11. Bridge inspection for the reconstruction of the Chengui–Mingshan road in Daye

    Funding / Client
    Industry-sponsored project
    Duration
    2013.05.01–2013.12.01
  12. Inspection for the upgrading and widening of the Liangongpu–Yanzhen section of the Class I highway on National Highway 106 in Yangxin

    Funding / Client
    Industry-sponsored project
    Duration
    2012.07.01–2012.08.01
  13. Upgrading and widening of the Class I highway on National Highway 106 from Jinqiao, Daye, to Liangongpu, Yangxin

    Funding / Client
    Industry-sponsored project
    Duration
    2012.01.01–2012.11.01
  14. Load-bearing capacity testing and safety appraisal of typical precast foundation components for the 2024 distribution network projects of Xiangyang Chengzhi Electric Power Design Co., Ltd.

    Funding / Client
    Industry-sponsored project
    Duration
    2024.12.10–2025.12.10
  15. Structural safety appraisal and basement strengthening schemes for the Fuying Xiangchajun development

    Funding / Client
    Industry-sponsored project
    Duration
    2014.01.01–2014.08.01
  16. Bridge safety analysis and assessment for Contract SJA2 of the Guangzhou–Shenzhen section upgrading and widening project on the Beijing–Hong Kong–Macao Expressway (specialized design)

    Funding / Client
    Industry-sponsored project
    Duration
    2023.11.16–2024.02.29
  17. Safety risk assessment of the Jiayu Yangtze River Highway Bridge

    Funding / Client
    Commissioned by industry
    Duration
    2014–2015

    Principal investigator

  18. Safety risk assessment of the Xiangxi Yangtze River Bridge

    Funding / Client
    Commissioned by industry
    Duration
    2013–2015

    Principal investigator

  19. Safety risk assessment of the Hanjiang Bridge and Dahuashan Tunnel on the Yunshi Expressway

    Funding / Client
    Commissioned by industry
    Duration
    2011–2013

    Principal investigator

  20. Safety risk assessment of bridges and tunnels on the Hubei section of the Liwan Expressway

    Funding / Client
    Commissioned by industry
    Duration
    2011–2013

    Principal investigator

  21. Safety risk assessment of the Baokang Extra-Long Tunnel on the Macheng–Zhuxi Expressway

    Funding / Client
    Industry-sponsored project
    Duration
    2010.12.01–2011.01.01
  22. Safety risk assessment of the Yizhang Nannan Expressway from Yidu to the Hubei–Hunan provincial boundary

    Funding / Client
    Industry-sponsored project
    Duration
    2018.11.14–2018.12
  23. Safety risk assessment of the Qilinguan and Luhongshan tunnels on the Hubei section of the Yizhang Nannan Expressway

    Funding / Client
    Industry-sponsored project
    Duration
    2018.10.01–2018.11.01
  24. Seismic structural systems for long-span continuous rigid-frame bridges with steel bottom plates and corrugated steel webs in areas of high seismic intensity

    Funding / Client
    Industry-sponsored project
    Duration
    2025.05.17–2026.01.31
  25. Bridge seismic systems incorporating isolation bearings with wire-rope dampers

    Funding / Client
    Industry-sponsored project
    Duration
    2023.12.03–2024.12.31
  26. Computational analysis of seismic isolation and vibration mitigation for bridges on the Kunming suburban railway

    Funding / Client
    Industry-sponsored project
    Duration
    2013.03.01–2014.08.01
  27. Wind-induced effects on wind-sensitive photovoltaic support structures with steel members close to the ground

    Funding / Client
    Industry-sponsored project
    Duration
    2024.01.01–2025.12.31
  28. Wind-induced vibration control of the Yanshantou long-span power transmission towers

    Project distinction
    China’s first project on wind-induced vibration control of power transmission towers
    Duration
    1997–1998

    Key researcher

  29. Earth-pressure-balance shield tunneling techniques for the Wuhan Metro

    Funding / Client
    Commissioned by industry
    Duration
    2015–2016

    Principal investigator

  30. Digital process planning, production scheduling optimization and intelligent management and control systems for discrete manufacturing

    Funding / Client
    Industry-sponsored project
    Duration
    2023.07.01–2024.07.01
  31. Computational analysis of slope stability at the Zhongye Beiluyuan development

    Funding / Client
    Industry-sponsored project
    Duration
    2009.01.01–2009.02.01
  32. New techniques for strengthening cofferdam foundations in deep overburden deposits

    Funding / Client
    Key Project of the State Power Corporation of China
    Duration
    2000

    Key contributor

  33. Verification analysis of three-dimensional steady-state seepage in the Gaobazhou dam area

    Funding / Client
    Commissioned by the Changjiang Water Resources Commission
    Duration
    2000

    Key contributor

  34. Seismic reliability analysis of the spillway section of the Xiangjiaba Dam

    Funding / Client
    Commissioned by industry
    Duration
    2002–2003

    Key contributor

  35. Joint Enterprise Technology Center of Wuhan University of Technology and Hubei Quanzhou Yangzijiang Construction Engineering Co., Ltd.

    Funding / Client
    Industry-sponsored project
    Duration
    2019.11.01–2022.12.01
  36. Joint Enterprise Technology Center of Wuhan University of Technology and Chidong Construction Group Co., Ltd.

    Funding / Client
    Industry-sponsored project
    Duration
    2019.03.01–2021.03.01
  37. Joint Enterprise Technology Center of Wuhan University of Technology and Hubei Zhonghao Construction Co., Ltd.

    Funding / Client
    Industry-sponsored project
    Duration
    2016.05.01–2018.12.01
  38. Joint establishment of the Wuhan University of Technology–Hubei Chang’an Construction Technology Center

    Funding / Client
    Industry-sponsored project
    Duration
    2016.01.01–2019.12.01
  39. Cooperation to establish the Wuhan University of Technology–Guangsha Hubei Sixth Construction Technology Center

    Funding / Client
    Industry-sponsored project
    Duration
    2014.03.01–2018.03.01